国产精品久久综合亚洲,国产成人国产在线观看,国产性精品,久久综合一个色综合网,成人不卡国产福利电影在线看,日韩精品夜色二区91久久久,亚洲人成人99网站,亚洲人成77777在线观看网 ,国模精品视频一区二区三区,欧美XXXX做受欧美

您好,歡迎來到濟(jì)南通宇恒成自動(dòng)化工程有限公司網(wǎng)站!

服務(wù)熱線

當(dāng)前位置: 首頁- 新聞中心 > 業(yè)內(nèi)資訊
常見問題
新聞中心

高低壓配電柜應(yīng)該怎么擺放?

發(fā)布時(shí)間:2023-12-28 來源:http://www.apdg.com.cn/ 瀏覽量:

1、配電柜的標(biāo)高或筆直度超出答應(yīng)偏差,是由于丈量定位不或者是地上凹凸不平形成的,應(yīng)及時(shí)進(jìn)行批改。

1. The elevation or straightness of the distribution cabinet exceeding the allowable deviation is due to poor measurement positioning or uneven ground, and should be corrected in a timely manner.

2、 配電柜在設(shè)備鐵架之前未進(jìn)行調(diào)直找正,或設(shè)備時(shí)固定點(diǎn)位置偏移形成的,運(yùn)用吊線重新找正后再進(jìn)行固定。

2. If the distribution cabinet is not straightened and aligned before the equipment iron frame, or if the fixed point position of the equipment is offset, use a suspension wire to re align and then fix it.

3、配電柜面電具、儀表不牢固、平允或距離不均,壓頭不牢、壓頭傷線芯,多股導(dǎo)線壓頭未裝壓線端子。閘具下方未裝卡片框。不緊的應(yīng)擰緊,距離應(yīng)按要求高速均勻,找平整。傷線芯的部分應(yīng)剪掉重接,多股線應(yīng)裝上壓線端子,卡片框應(yīng)補(bǔ)裝。

20220303034941460.jpg

3. The electrical appliances and instruments on the distribution cabinet surface are not firm, level or uneven in distance, the pressure head is not firm, the pressure head damages the wire core, and the pressure head of multiple wires is not equipped with pressure wire terminals. There is no card frame installed below the gate. The parts that are not tight should be tightened, and the distance should be high-speed and uniform according to the requirements, and the surface should be leveled. The damaged part of the wire core should be cut off and reconnected, multi stranded wires should be equipped with crimping terminals, and card frames should be repaired.

4、配電柜接地導(dǎo)線截面不夠或維護(hù)地線截面不夠,維護(hù)地線串接,對(duì)這些不符合要求的應(yīng)按有關(guān)規(guī)定進(jìn)行糾正。

4. The grounding wire section of the distribution cabinet is insufficient or the maintenance ground wire section is insufficient, and the maintenance ground wire is connected in series. Any non-compliance with these requirements should be corrected according to relevant regulations.

5、配電柜后配線擺放不整齊。應(yīng)按支路綁扎成束,并固定在盤內(nèi)。

5. The wiring behind the distribution cabinet is not neatly arranged. It should be tied into bundles according to the branch and fixed in the tray.

6、配電柜(盤)缺零部件,如合頁、鎖、螺絲等,應(yīng)配齊各種設(shè)備所需零部件。

6. The distribution cabinet (panel) lacks components such as hinges, locks, screws, etc., and should be equipped with all necessary components for the equipment.

7、內(nèi)壁粗糙木箱內(nèi)部應(yīng)修理平整,表里做處理,并應(yīng)考慮措施。

7. The rough inner wall of the wooden box should be repaired and leveled, and the surface and interior should be treated, and measures should be considered.

8、配電柜內(nèi)壁焊點(diǎn)銹蝕,應(yīng)補(bǔ)刷防銹漆。鐵柜不得用電(氣)焊進(jìn)行開孔,應(yīng)采用開孔器進(jìn)行開孔。

8. The welding points on the inner wall of the distribution cabinet are corroded and should be repainted with anti rust paint. The iron cabinet shall not be opened with electric (gas) welding, and a hole opener shall be used for opening.

9、配電柜內(nèi)二層板與進(jìn)、出線配管位置處理不當(dāng),形成配線擺放不整齊,在設(shè)備配電柜時(shí)應(yīng)考慮進(jìn)出線配管管口位置應(yīng)設(shè)置在二層板后邊。

9. Improper handling of the position of the second floor board and the inlet and outlet piping inside the distribution cabinet has resulted in uneven wiring arrangement. When installing equipment distribution cabinets, it should be considered that the inlet and outlet piping openings should be placed behind the second floor board.

首頁首頁 產(chǎn)品產(chǎn)品 電話電話 置頂置頂
久久爱电影| 国产haodiaose最新| 两个人看的www高清视频| 国产精品天天狠天天看| 97色伦综合在线欧美视频| 无码一区二区三区不卡AV| 国产国产乱老熟女视频网站97| 久久99国产精一区二区三区!| 伊人久久大香线蕉aⅴ色| 蜜桃av无码免费看永久| 无码不卡免费一级毛片视频| 苍井空一区二区三区在线观看| 久久精品国产精品国产一区| 欧美嫩交一区二区三区| 男人天堂亚洲天堂女人天堂| 亚洲精品国产aⅴ成拍色拍| 国产精品自在拍首页视频8| 亚洲成人av在线资源| 久久精品成人一区二区三区| 国产乱人伦AV在线麻豆A| 美女黄网站18禁免费看| 亚洲a∨大乳天堂在线| 久久人人爽天天玩人人妻精品| igao国产精品| 国产妇女馒头高清泬20p多毛| 亚洲成a人片77777kkkk| 欧美另类图片视频无弹跳第一页| 国产精品av中文字幕| 性做久久久久久久| 999福利激情视频| 国产乱色国产精品免费视频| 国产成人精品无码专区| 亚洲欧洲精品成人久久av| 亚洲男人的天堂AV手机在线观看| 日韩AV无码午夜免费福利制服 | 国产亚洲制服免视频| 成全高清在线播放电视剧| 中文字幕日韩不卡一区| 亚洲精品中文av在线| 大学生久久香蕉国产线看观看| 亚洲欧美成人a∨观看|